Reconfigurable OFDMA-based Cooperative NetworKs Enabled by Agile SpecTrum Use
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP7-ICT-2007-1
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
18418/2008-32
Alternative language
Project name in Czech
Reconfigurable OFDMA-based Cooperative NetworKs Enabled by Agile SpecTrum Use
Annotation in Czech
The project aims at provisioning a ubiguitou s wireless solution to reach bit rates higher than 100Mb ps with peak throughputs higher than 1Gb ps, based on Reconfigurable OFDMA Cooperative Networks enabled by agile spectrum use (ROCKET). While increasingpeak reates is a natural must-do for new standards, providing homogeneous high rate coverage is equally inportant as it guarantees a constant a constant user experience over the whole served area and is the key enabler to a higher average spectral efficiency of the system. Those goals are inline with the IMT-Advanced requirements described in [ITU-RM1645]and match the requirements of the IEEE 802.16 Task Group m (TGm) for Advanced Air Interface. In order to quarantee a strong focus and efficiency in the project, we propose to limit the scope of our invetigations to two questions which we believe will be at the centre of future IMT-advanced system design: 1.How can we increase the bandwidth and make the whole system benefit from it? 2.How can we
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
IN - Informatics
CEP - secondary branch
BB - Applied statistics, operational research
CEP - another secondary branch
JA - Electronics and optoelectronics
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10103 - Statistics and probability<br>10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)<br>20201 - Electrical and electronic engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jan 1, 2008
Realization period - end
Dec 31, 2009
Project status
U - Finished project
Latest support payment
Apr 17, 2009
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP10-MSM-7E-U/01:1
Data delivery date
Jun 30, 2010
Finance
Total approved costs
864 thou. CZK
Public financial support
864 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK