The use of optimization processes for the efficient design of structures of cooling tower
Project goals
The aim of the project is to create a methodology for efficient design of cooling towers to ensure the largest possible reduction in the cost of their construction, while ensuring their long-term operability. The results of the project will be directly applied in practical design and implementation of these structures will mean a reduction in the total cost of the construction and operation of cooling towers. Efficient design methodology will be based on many optimization analysis and experimental results and measurements on real structures.
Keywords
cooling towersdesign optimizationalgorithm development proposal; reduce consumption of materials
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme of applied research and experimental development ALFA
Call for proposals
ALFA 4 (STA02014TA04)
Main participants
České vysoké učení technické v Praze / Fakulta stavební
Contest type
VS - Public tender
Contract ID
2014TA04011743
Alternative language
Project name in Czech
Využití optimalizačních procesů pro efektivní návrh konstrukcí chladících věží
Annotation in Czech
Cílem projektu je vytvoření metodiky efektivního návrhu chladících věží zajišťující co největší redukci nákladů na jejich zhotovení a zároveň zajišťující jejich dlouhodobou provozuschopnost. Výsledky projektu budou přímo aplikovány v praktickém navrhování a realizaci těchto konstrukcí a budou znamenat snížení celkových nákladů na stavbu a provoz chladících věží. Metodika efektivního návrhu bude vycházet z mnoha optimalizačních analýz a výsledků experimentů a měření na reálných konstrukcích.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JM - Structural engineering
CEP - secondary branch
JN - Civil engineering
CEP - another secondary branch
JF - Nuclear energy
20101 - Civil engineering
20102 - Construction engineering, Municipal and structural engineering
20305 - Nuclear related engineering; (nuclear physics to be 1.3);
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The Opposition Panel agreed that the assignment was not fulfilled, due to the failure of all of the declared results, but the Contract was respected. Opponent Commission noted that the results were achieved only in substance, not in accordance with the valid one Methodology of evaluation of results of research organizations and evaluation of results completed programs. It is a prerequisite to achieve all declared results. All required documents (to the results: 2x certified methodology, 1x proven technology) were documented on 3 September 2018 and checked by the project rapporteur. He proposes to conclude the project with the final statement “Succeeded according to the assignment”.
Solution timeline
Realization period - beginning
Jul 1, 2014
Realization period - end
Dec 31, 2017
Project status
U - Finished project
Latest support payment
Feb 28, 2017
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP18-TA0-TA-U/09:1
Data delivery date
Sep 5, 2019
Finance
Total approved costs
8,890 thou. CZK
Public financial support
5,740 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
3,150 thou. CZK
Basic information
Recognised costs
8 890 CZK thou.
Public support
5 740 CZK thou.
64%
Provider
Technology Agency of the Czech Republic
CEP
JM - Structural engineering
Solution period
01. 07. 2014 - 31. 12. 2017