All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Actualisation of calculation models for determining the capacity of uncontrolled level cross-roads

Public support

  • Provider

    Ministry of Transport

  • Programme

    Safety and economical transport (National programme of research)

  • Call for proposals

    Bezpečná a ekonomická doprava 1 (SMD0200401)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    92/2004-210-TPV/1

Alternative language

  • Project name in Czech

    Aktualizace výpočtových modelů pro stanovení kapacity neřízených úrovňových křižovatek

  • Annotation in Czech

    Navrhovaný projekt si klade za cíl analyzovat používané metody výpočtu kapacit neřízených křižovatek. Analyzovány budou jak metody používané v ČR, tak metody používané v ostatních státech EU, popřípadě i ve státech dalších (HCM). Důležitým prvkem programu je jednoznačná návaznost na německý výzkum. Průzkumy bude nutné ověřit používané vstupní předpoklady používaných metod. Analýzou teoretických východisek již používaných metod a podrobnou statisticko - pravděpodobnostní analýzou údajů získaných průzkumyse pokusit navrhnout úpravu stávajících metod, popřípadě bude navržena metoda zcela nová.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    JM - Structural engineering

  • CEP - another secondary branch

    AP - Municipal, regional and transportation planning

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering<br>20104 - Transport engineering<br>50702 - Urban studies (planning and development)<br>50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The course of project´s solution and project´s outcomes correspond to the contract. The goal was accomplish, and desiderative outcomes was process.

Solution timeline

  • Realization period - beginning

    Apr 1, 2004

  • Realization period - end

    Mar 1, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Jun 1, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-MD0-1F-U/02:2

  • Data delivery date

    Apr 3, 2009

Finance

  • Total approved costs

    4,310 thou. CZK

  • Public financial support

    4,310 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK