All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research on the the input parameters for the effective modelling and simulation of the ITS services based on the variable message signs in the conditions of the Czech Republic.

Public support

  • Provider

    Ministry of Transport

  • Programme

    Safety and economical transport (National programme of research)

  • Call for proposals

    Bezpečná a ekonomická doprava 3 (SMD020081F002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    27/2008-520-TPV

Alternative language

  • Project name in Czech

    Výzkum vstupních parametrů pro efektivní modelování a simulaci ITS služeb na bázi proměnného dopravního značení v podmínkách České republiky

  • Annotation in Czech

    Cílem projektu je zjištění a praktické ověření tzv. "driver-acceptance" parametrů nutných pro efektivní, realistické SW modelování a simulaci ITS informačních systémů na bázi proměnného dopravního značení.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    AP - Municipal, regional and transportation planning

  • CEP - secondary branch

    JO - Land transport systems and equipment

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>20201 - Electrical and electronic engineering<br>50702 - Urban studies (planning and development)<br>50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The process of solution and the results comport with the contract. The aim was filled, required outputs were elaborated.

Solution timeline

  • Realization period - beginning

    Feb 1, 2008

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    May 28, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MD0-1F-U/01:2

  • Data delivery date

    Jul 1, 2010

Finance

  • Total approved costs

    3,150 thou. CZK

  • Public financial support

    3,150 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK