All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Investment optimation for nature protection during building and reconstruction of road and railway infrastructure in the Czech Republic

Project goals

The part of on going investment venture of building a reconstruction on transport infrastructure is also building of equipment decreasing effect of transportation to the environment and human health. The economic point of view is very complex problem. Often it shows there are very wideband investments on the similar equipment in the different site and usefulness of the equipment does not exist. Our experiences give us theory there is big gap for optimalization of economic investments according observance of standards for environment and human protection. The project brings basic solving of the theory. The project will focus on economic analyzes (cost-benefit, cost-effectiveness) of investment to equipments on transport infrastructure. Project outcomeswill be the Methodology of investment optimation for nature protection during building and reconstruction of road and railway infrastructure in the Czech Republic.

Keywords

Internalizationmeasuresenvironmenteconomic efficiencytransport infrastructure

Public support

  • Provider

    Ministry of Transport

  • Programme

    Safety and economical transport (National programme of research)

  • Call for proposals

    Bezpečná a ekonomická doprava 3 (SMD020081F002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    28/2008-520-TPV

Alternative language

  • Project name in Czech

    Optimalizace nákladů na ochranu životního prostředí při výstavbě a rekonstrukcích silniční a železniční sítě v ČR

  • Annotation in Czech

    Návrh algoritmů a výpočtový postup pro optimalizaci finanční náročnosti opatření na snížení zátěže životního prostředí a dopadů na lidské zdraví včetně jejich internalizace.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    AP - Municipal, regional and transportation planning

  • CEP - secondary branch

    AH - Economics

  • CEP - another secondary branch

  • 50201 - Economic Theory
    50202 - Applied Economics, Econometrics
    50203 - Industrial relations
    50204 - Business and management
    50205 - Accounting
    50206 - Finance
    50702 - Urban studies (planning and development)
    50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The process of solution and the results comport with the contract. The aim was filled, required outputs were elaborated.

Solution timeline

  • Realization period - beginning

    Feb 1, 2008

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    May 28, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MD0-1F-U/01:2

  • Data delivery date

    Jul 1, 2010

Finance

  • Total approved costs

    2,109 thou. CZK

  • Public financial support

    1,897 thou. CZK

  • Other public sources

    212 thou. CZK

  • Non public and foreign sources

    0 thou. CZK

Recognised costs

2 109 CZK thou.

Public support

1 897 CZK thou.

0%


Provider

Ministry of Transport

CEP

AP - Municipal, regional and transportation planning

Solution period

01. 02. 2008 - 31. 12. 2009