modification and study of dimensionality of nanostructure - based materials
Public support
Provider
Ministry of Education, Youth and Sports
Programme
Programme of regional and international cooperation in R&D (National programme of research)
Call for proposals
Regionální a mezinárodní spolupráce ve výzkumu 2 (SMSM2004001P2)
Main participants
—
Contest type
VS - Public tender
Contract ID
30 324/2004-32
Alternative language
Project name in Czech
Modifikace a studie dimensionality nanostrukturních materiálů
Annotation in Czech
studium vlastností organo-křemičitých materiálů s proměnnou dimensionalitou, degradabilita a nestabilita, vývoj nových materiálů
Scientific branches
R&D category
NV - Nonindustrial research (Applied research excluded Industrial research)
CEP classification - main branch
JJ - Other materials
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
The influence of dimensionality &steric properties of nanostructural materials on stability °radability with focus on polysilanes was studied. Building clean vacuum apparatus for the desorption measurements on organic substances with mass spectrometer
Solution timeline
Realization period - beginning
Jan 1, 2005
Realization period - end
Dec 31, 2007
Project status
U - Finished project
Latest support payment
Apr 4, 2007
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP08-MSM-1P-U/01:1
Data delivery date
Jun 26, 2008
Finance
Total approved costs
802 thou. CZK
Public financial support
438 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
364 thou. CZK