All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimalisation of the solar wind monitor based on INTERBALL - 1 data processing

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    Programme of regional and international cooperation in R&D (National programme of research)

  • Call for proposals

    Regionální a mezinárodní spolupráce ve výzkumu 2 (SMSM2004001P2)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    30 324/2004-32

Alternative language

  • Project name in Czech

    Optimalizace monitoru slunečního větru založená na zpracování dat projektu INTERBALL - l

  • Annotation in Czech

    zpracování meření přístroje VDP, identifikace oblastí s parametry plazmatu obdobnými slunečnímu větru, vypracování algoritmu pro jejich výpočet

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    BN - Astronomy and celestial mechanics, astrophysics

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10308 - Astronomy (including astrophysics,space science)

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The already existing satellite data were ušed for development of an optimal detector systém that speeds up the determination of the solar wind parameters by an order of magnitude. Results were published in 4 journal articles and 5 conference proceedings.

Solution timeline

  • Realization period - beginning

    Jan 1, 2005

  • Realization period - end

    Dec 31, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Apr 4, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-MSM-1P-U/01:1

  • Data delivery date

    Jun 26, 2008

Finance

  • Total approved costs

    968 thou. CZK

  • Public financial support

    218 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    750 thou. CZK