All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Environmentally friendly oxidants iron (VI): synthesis and applications in water quality security

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    Programme of regional and international cooperation in R&D (National programme of research)

  • Call for proposals

    Regionální a mezinárodní spolupráce ve výzkumu 2 (SMSM2004001P2)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Železany jako oxidační činidlo šetrné k životnímu prostředí - syntéza a aplikace ve zpracování vody

  • Annotation in Czech

    mechanismus chemické oxidace železa na mokré a suché cestě do stupně VI, oxidace elektrochemická, průmyslová výroba, dekontaminace pitné vody

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    CI - Industrial chemistry and chemical engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The role of anode material and electrolyte composition in Ferrated synthesis was clarified. The direct electrochemical synthesis of solid Ferrate and synthesis in the moltens alts environment was studied.

Solution timeline

  • Realization period - beginning

    Jan 1, 2005

  • Realization period - end

    Jan 1, 2006

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP07-MSM-1P-U/01:1

  • Data delivery date

    Jun 15, 2007

Finance

  • Total approved costs

    132 thou. CZK

  • Public financial support

    132 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK