All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Resilience of the distribution systém during national grid blackout to improve safety of population

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    Sustainable welfare

  • Call for proposals

    Trvalá prosperita 1 (SMPO200600001)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2A-1TP1/065

Alternative language

  • Project name in Czech

    Zvýšení odolnosti distribuční soustavy proti důsledkům dlouhodobého výpadku přenosové soustavy ČR s cílem zvýšení bezpečnosti obyvatel.

  • Annotation in Czech

    Název programového projektu: Zvýšení odolnosti distribuční soustavy proti důsledkům dlouhodobého výpadku přenosové soustavy ČR s cílem zvýšení bezpečnosti obyvatel. Cíl programového projektu: Zvýšit bezpečnost obyvatel v regionech, majetku a životního prostředí a omezit ekonomické škody v důsledku dlouhodobých výpadků elektrikcé energie. Snížit neakceptovatelné riziko dopadů sice zatím nepříliš pravděpodobných ale možných krizových situací v zásobování elektřinou, jakožto klíčové složky kritické infrastruktury.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The results demonstrate feasibility of vision to increase the resistance of the distribution systém against long-term failure of the transmission systém (blackout).

Solution timeline

  • Realization period - beginning

    Nov 15, 2006

  • Realization period - end

    Oct 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Apr 29, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MPO-2A-U/01:1

  • Data delivery date

    Jul 23, 2012

Finance

  • Total approved costs

    56,237 thou. CZK

  • Public financial support

    24,500 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    31,738 thou. CZK