Fuel cell-based back-up power systém for telecommunications
Project goals
Research and development of low temperature alkaline fuel cell-based back-up power systém for telecommunications.
Keywords
Fuel celllow temperatureback-up power systémtelecommunications
Public support
Provider
Ministry of Industry and Trade
Programme
Sustainable welfare
Call for proposals
Trvalá prosperita 1 (SMPO200600001)
Main participants
—
Contest type
VS - Public tender
Contract ID
2A-1TP1/110
Alternative language
Project name in Czech
Záložní napájení pro telekomunikace na principu palivových článků.
Annotation in Czech
Výzkum a vývoj záložního napájení pro telekomunikace na principu nízkoteplotních alkalických palivových článků.
Scientific branches
R&D category
VV - Exeperimental development
CEP classification - main branch
JE - Non-nuclear power engineering, energy consumption and utilization
CEP - secondary branch
CG - Electrochemistry
CEP - another secondary branch
—
10405 - Electrochemistry (dry cells, batteries, fuel cells, corrosion metals, electrolysis)
20704 - Energy and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
In this project was developed 2 KW alkaline fuel cell prototype for byck up power application. Total electrical efficiency of the system is over 50%.
Solution timeline
Realization period - beginning
Nov 20, 2006
Realization period - end
Aug 31, 2009
Project status
U - Finished project
Latest support payment
Apr 24, 2009
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP10-MPO-2A-U/02:2
Data delivery date
Sep 15, 2010
Finance
Total approved costs
10,679 thou. CZK
Public financial support
5,880 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
4,798 thou. CZK
Basic information
Recognised costs
10 679 CZK thou.
Public support
5 880 CZK thou.
55%
Provider
Ministry of Industry and Trade
CEP
JE - Non-nuclear power engineering, energy consumption and utilization
Solution period
20. 11. 2006 - 31. 08. 2009