All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Reasearch of materials, production technology and methodology verification vase for storage and transport of hydrogen, ground gas and bio - gas inclusive of assesment term application.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    Sustainable welfare

  • Call for proposals

    Trvalá prosperita 2 (SMPO200700001)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    2A-2TP1/023

Alternative language

  • Project name in Czech

    Výzkum materiálu, výrobních technologií a metodik ověřování nádob pro skladování a transport vodíku, zemního plynu a bioplynu včetně stanovení podmínek používání.

  • Annotation in Czech

    Tento programový projekt přináší unikátní komplexní výzkum a vývoj materiálů, návrh a ověření technologie výroby a metod testování kovových a kompozitových tlakových nádob, zejména pro nízkoteplotní aplikace. Součástí projektu je studium napěťových stavů, návrh tvarové pevnosti a designu nových typů tlakových nádob. Práce na projektu jsou rozděleny na osm etap v průběhu 5 let. Finální verze technologie výroby a zkoušení tlakových nádob přinese v konečném důsledku značnou úsporu energie pro konečného uživatele výrobku, významně přispěje k ochraně životního prostředí a bezpečnosti při výrobě, transportu, skladování, distribuci a využití stlačených plynů.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    JG - Metallurgy, metal materials

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    There was performed detailed material research and development, draft and verification of new production cylinders technology and testing. There was researched stress aspects, analysis of structure, constructed new design of cylinders.

Solution timeline

  • Realization period - beginning

    Jul 3, 2007

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Apr 29, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-2A-U/02:2

  • Data delivery date

    Sep 15, 2010

Finance

  • Total approved costs

    27,114 thou. CZK

  • Public financial support

    10,369 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    16,744 thou. CZK