LNG - Metrology for Liquefied Natural Gas
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP6-2005-Energy-4
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
18931/2011-321
Alternative language
Project name in Czech
LNG - Metrology for Liquefied Natural Gas
Annotation in Czech
The trade of natural gas, between countries not served by pipelines, is made more economically viable by the process of liquefaction, which greatly reduces the volume required for transport. The natural gas is liquefied at the beginning of its journey, loaded onto specially designed cryogenic tankers for transport and then regasified at its destination, where it can be pumped as normal through gas networks. When Liquefied Natural Gas (LNG) is traded, measurements are taken of volume, density and calorific value to calculate the amount of energy transferred, but measurement uncertainties are currently too high to guarentee fair trade. This project will test a variety of methods for making these measurements, compare them to one another and suggest improvements. The project will strengthen the measurement framework for LNG, with an expected halving of measurement uncertainties, and will also disseminate knowledge through training, workshops and contribution to international standards and guidelines.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JB - Sensors, detecting elements, measurement and regulation
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20201 - Electrical and electronic engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The overall objective of the project was to contribute to a significant reduction of uncertainty in the determination of transferred energy in LNG custody transfer processes. The project supported traditional and innovative measurement methods by providing a metrological framework consisting of the test and calibration standards together with the written standards and guidelines.
Solution timeline
Realization period - beginning
Jan 1, 2011
Realization period - end
Apr 30, 2013
Project status
U - Finished project
Latest support payment
Mar 31, 2013
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP14-MSM-7A-U/01:1
Data delivery date
Jun 30, 2014
Finance
Total approved costs
957 thou. CZK
Public financial support
957 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK