All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Overvoltages in Medium Voltage Networks

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP6-2004-Mobility-12

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-8032/2013-311

Alternative language

  • Project name in Czech

    Přepětí v sítích VN

  • Annotation in Czech

    Development of new methodologies and improvements of current methods for minimizing overvoltages in medium voltage networks. Also, the reduction of effects of higher harmonics arising from the use of renewable power sources. Proper configuration of technical parameters for new voltage arresters to be suitably sized and designed during the construction of individual high voltage devices. Project will be solved in high voltage laboratories of the Department of Electric Power Engineering and EnvironmentalEngineering, Faculty of Electrical Engineering, University of West Bohemia in Pilsen, Czech Republic in cooperation with the Department of Electrical Engineering and Information Technology, Professorship of Power Systems and High-Voltage Engineering, Chemnitz University of Technology, Germany.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    This project is being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.

Solution timeline

  • Realization period - beginning

    Jan 1, 2013

  • Realization period - end

    Dec 31, 2014

  • Project status

    U - Finished project

  • Latest support payment

    Feb 4, 2014

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP15-MSM-7A-U/01:1

  • Data delivery date

    Jul 2, 2015

Finance

  • Total approved costs

    94 thou. CZK

  • Public financial support

    94 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK