Overvoltages in Medium Voltage Networks
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP6-2004-Mobility-12
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-8032/2013-311
Alternative language
Project name in Czech
Přepětí v sítích VN
Annotation in Czech
Development of new methodologies and improvements of current methods for minimizing overvoltages in medium voltage networks. Also, the reduction of effects of higher harmonics arising from the use of renewable power sources. Proper configuration of technical parameters for new voltage arresters to be suitably sized and designed during the construction of individual high voltage devices. Project will be solved in high voltage laboratories of the Department of Electric Power Engineering and EnvironmentalEngineering, Faculty of Electrical Engineering, University of West Bohemia in Pilsen, Czech Republic in cooperation with the Department of Electrical Engineering and Information Technology, Professorship of Power Systems and High-Voltage Engineering, Chemnitz University of Technology, Germany.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JE - Non-nuclear power engineering, energy consumption and utilization
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20704 - Energy and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
This project is being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.
Solution timeline
Realization period - beginning
Jan 1, 2013
Realization period - end
Dec 31, 2014
Project status
U - Finished project
Latest support payment
Feb 4, 2014
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP15-MSM-7A-U/01:1
Data delivery date
Jul 2, 2015
Finance
Total approved costs
94 thou. CZK
Public financial support
94 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK