All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

A quantum standard for sampled electrical measurements

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP6-2005-Energy-4

  • Main participants

    Český metrologický institut

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-45248/2013-7

Alternative language

  • Project name in Czech

    A quantum standard for sampled electrical measurements

  • Annotation in Czech

    Aim: The JRP will bring about a fundamental change to the way in which the volt is disseminated in the SI for AC waveforms. Direct traceability to the quantum standard of voltage, based on the Josephson effect will be provided for sampled electrical measurements. Thus there will no longer be a distinction between so-called DC and AC measurements for the volt and a direct link to the SI for digital measurement systems will be provided at operating frequencies of up to 10 MHz.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JA - Electronics and optoelectronics

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jun 1, 2013

  • Realization period - end

    May 31, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Feb 24, 2016

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP17-MSM-7A-U/01:1

  • Data delivery date

    Jun 20, 2017

Finance

  • Total approved costs

    1,234 thou. CZK

  • Public financial support

    709 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    525 thou. CZK