Metrology for new electrical measurement quantities in high-frequency circuits
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP6-2005-Energy-4
Main participants
Český metrologický institut
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-45248/2013-7
Alternative language
Project name in Czech
Metrology for new electrical measurement quantities in high-frequency circuits
Annotation in Czech
The capability and functionality of test instrumentation enabling state-of-the-art high-frequency electrical circuit analysis has advanced dramatically during the past 5 to 10 years, but traceability to the SI has lagged behind these technical developments. These advancements have introduced new measurement quantities, and evolved existing measurement quantities, that are being used in radio frequency (RF), microwave, millimetre-wave and submillimetre-wave areas of technology. However, these quantities(e.g. mixed-mode S-parameters, X-parameters and S-parameters at millimetre- and submillimetre-wave frequencies) fall outside the scope of existing SI units and the traceability currently provided by the world?s National Measurement Institutes (NMIs). Thelack of traceability for the newly developed instrumentation introduces a barrier to the use of this instrumentation in high value, high impact, fields ? for example, medical, security, consumer electronics and environmental monitoring uses. The advancements in instrumentation have been required to meet the needs of existing and next-generation end-user applications, e.g. in industry and elsewhere. The challenge that this JRP addresses is to put in place traceability and dissemination mechanisms for these measurement quantities and to ensure maximum impact on the end-user community.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
BA - General mathematics
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10101 - Pure mathematics
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jul 1, 2013
Realization period - end
Jun 30, 2016
Project status
U - Finished project
Latest support payment
Feb 24, 2016
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP17-MSM-7A-U/01:1
Data delivery date
Jun 20, 2017
Finance
Total approved costs
4,374 thou. CZK
Public financial support
2,502 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
1,872 thou. CZK