All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Multiphase flow metrology in oil and gas production

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    EMRP Call 2013

  • Main participants

    Český metrologický institut

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    ENG58

Alternative language

  • Project name in Czech

    Multiphase flow metrology in oil and gas production

  • Annotation in Czech

    The JRP-Consortium comprises of leading European multiphase flow metrology laboratories, representing around half of the total number world-wide, two NMIs renowned for their work on advanced numerical modelling and device manufacturers/developers that are at the global forefront of multiphase metering and visualisation technology. The JRP is further supported by two REGs who bring fundamental expertise in key areas. The JRP will be very widely disseminated through numerous publications, training routes and bodies responsible for standards and norms – including

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    BK - Liquid mechanics

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jan 1, 2015

  • Realization period - end

    May 31, 2017

  • Project status

    U - Finished project

  • Latest support payment

    Feb 20, 2017

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP18-MSM-7A-U/03:1

  • Data delivery date

    Jun 11, 2018

Finance

  • Total approved costs

    3,191 thou. CZK

  • Public financial support

    1,782 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,409 thou. CZK