Improvement of the internal wall surface of seamless tubes by optimisation and anticipating management of the mandrel bar operation and supervision of the internal tool process
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1087/2011-321
Alternative language
Project name in Czech
Improvement of the internal wall surface of seamless tubes by optimisation and anticipating management of the mandrel bar operation and supervision of the internal tool process
Annotation in Czech
This project aims to optimise the internal wall surface of seamless tubes. Systems to measure internal tool condition and process forces will provide a database for correlation analysis and on-line prediction-based processing and anticipating maintenance. Hybrid correlation & Finite Element Models will predict the internal wall surface quality based on internal tool condition evolution and tool process parameters. New wear resistant tool materials/coatings and enhanced process lubrication will be introduced to optimize internal tool surface and process parameters. A supervision system will integrate the online information and an anticipating strategy to handle internal tool processes and maintenance proposals e. g. of the time to replace the tool. Thesystem will be demonstrated at a push bench tube line of Benteler.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JG - Metallurgy, metal materials
CEP - secondary branch
JQ - Machinery and tools
CEP - another secondary branch
JP - Industrial processes and processing
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20302 - Applied mechanics<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Apr 1, 2009
Realization period - end
Dec 31, 2012
Project status
U - Finished project
Latest support payment
Mar 30, 2012
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP13-MSM-7C-U/01:1
Data delivery date
Jun 28, 2013
Finance
Total approved costs
1,504 thou. CZK
Public financial support
1,504 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK