Research on innovative corrosion resistant gradient tubes for biomass power generation installations
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
Open Call RFCS-RTD-2012
Main participants
COMTES FHT a.s.
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-42111/2013
Alternative language
Project name in Czech
Research on innovative corrosion resistant gradient tubes for biomass power generation installations
Annotation in Czech
Project main aim is to acquire knowledge necessary to develop new cost-effective manufacturing technology of boiler tubes with through thickness gradient chemical composition. Our solution is devoted to application of tubes made from ingots with through thickness gradient chemical composition, tailored to carry both creep loading (low alloyed body) and high temperature corrosion – erosion (high alloyed shell). Desired chemical heterogeneity of semiproduct is supposed to be obtained by using unique casting approach based on deep understanding of steel and nickel based alloys metallurgy, their thermal characteristics and high temperature physical properties.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JG - Metallurgy, metal materials
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20501 - Materials engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jul 1, 2013
Realization period - end
Jun 30, 2017
Project status
U - Finished project
Latest support payment
Feb 15, 2017
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP18-MSM-7C-U/01:1
Data delivery date
Jun 11, 2018
Finance
Total approved costs
2,993 thou. CZK
Public financial support
2,993 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK