Risk based Performance Prediction and Lifetime Assessment of Concrete Structures
Public support
Provider
Ministry of Education, Youth and Sports
Programme
Eurostars
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1600/2010-32
Alternative language
Project name in Czech
Risk based Performance Prediction and Lifetime Assessment of Concrete Structures
Annotation in Czech
The aim of the project is to assess concrete structures in a complex way - going from the health monitoring to virtual reliability analysis. The extension of probabilistic advanced analysis methods of concrete structures, the optimization and adaptationof structural health monitoring systems associated with probabilistic concepts will be combined by a software system in an cost risk tree based decision module. The developed software should allow an integrated approach with respect to cost optimized reliability - assessment, maintenance and lifetime planning of engineering structures.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JM - Structural engineering
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20102 - Construction engineering, Municipal and structural engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The main development in combination of nonlinear computation, reliability techniques, identification, degradation and lifetime assessment tools has been finalized. The metodology has been implemented into software tools, validated on practical examples and documented. The created tools and their utilization were presented at several scientific conferences, exhibitions and software user seminars.
Solution timeline
Realization period - beginning
May 1, 2008
Realization period - end
Mar 31, 2011
Project status
U - Finished project
Latest support payment
Mar 10, 2011
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP12-MSM-7D-U/01:1
Data delivery date
Jul 12, 2012
Finance
Total approved costs
7,220 thou. CZK
Public financial support
3,504 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
2,336 thou. CZK