Integrated Gas Powertrain - Low Emission, CO2 optimized an efficient CNG engines for passenger cars (PC) and light duty vehicles (LDV)
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP7-SST-2007-RTD-1
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
3096/2010-32
Alternative language
Project name in Czech
Integrated Gas Powertrain - Low Emission, CO2 optimized an efficient CNG engines for passenger cars (PC) and light duty vehicles (LDV)
Annotation in Czech
Main objective of InGas Project is to deploy a custom designed natural gas fueled engine integrated with specific aftertreatment systems appled to a light duty vehicle able to achieve a 10 % higher fuel conversion efficiency than that of a corresponding2006 diesel vehicle and complying with an emission level lower than Euro 6. Both the stoichiometric and lean burn concept will be investigated and assessed. Additional features are advanced storage systems and vehicle architectures, as well as multi-grade fuel tolerance and fuel flexibility.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JT - Propulsion, engines and fuels
CEP - secondary branch
BJ - Thermodynamics
CEP - another secondary branch
JB - Sensors, detecting elements, measurement and regulation
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20201 - Electrical and electronic engineering<br>20301 - Mechanical engineering<br>20303 - Thermodynamics<br>20704 - Energy and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Oct 1, 2009
Realization period - end
Sep 30, 2011
Project status
U - Finished project
Latest support payment
Mar 10, 2011
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP12-MSM-7E-U/01:1
Data delivery date
Jul 12, 2012
Finance
Total approved costs
1,327 thou. CZK
Public financial support
1,327 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK