European Planetology Network Research Infrastructure
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP7-INFRASTRUCTURES-2008-2
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1090/2011-321
Alternative language
Project name in Czech
European Planetology Network Research Infrastructure
Annotation in Czech
Only in recent years has Europe?s own planetary space science programme received wide spread recognition and attention by the EU political establishment, the international media and the European public. In part this is due to the enormous power, budget and media profile of NASA but also it is only in the last decade that the European Space Agency (ESA) has established an exciting and innovative planetary science programme of its own. The outstanding success of Mars Express (the first purely European mission to another planet), the dramatic landing of the European Huygens probe on Titan in January 2005 and the on-going success of the joint ESA/NASA Cassini-Huygens Mission to Saturn has shown Europe?s capability and innovation in space and planetary science technology. The launch of the Rosetta mission to study and land upon a comet; the preparation of the Bepi-Colombo mission to Mercury; Europe?s major investment in the European Southern Observatory (ESO), through use of the Very Large Telesco
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
BL - Plasma physics and discharge through gases
CEP - secondary branch
DG - Atmospheric sciences, meteorology
CEP - another secondary branch
GD - Fertilization, irrigation, soil treatment
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10305 - Fluids and plasma physics (including surface physics)<br>10509 - Meteorology and atmospheric sciences<br>10510 - Climatic research<br>40101 - Agriculture
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jan 1, 2010
Realization period - end
Dec 31, 2012
Project status
U - Finished project
Latest support payment
Apr 18, 2012
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP13-MSM-7E-U/01:1
Data delivery date
Jun 28, 2013
Finance
Total approved costs
175 thou. CZK
Public financial support
175 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK