The Packaging of futuRe Integrated ModulAr Electronics
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP7-AAT-2010-RTD-1
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-1839/2013-310
Alternative language
Project name in Czech
The Packaging of futuRe Integrated ModulAr Electronics
Annotation in Czech
The packaging of future Integrated Modular electronics objective is to develop a new flexible, robust and open commercial aeronautical packaging of embedded electronics for future aircraft. This new standard will be able to replace the 35 year old ARINC600 standard, integrating the new archtecture concepts and technologies trends. The project is an enabling key building block for the next generation of electronics and particulary to Integrated Modular Avionics for future large and regional aircraft. Project objectives are: 1. reduce electronics packaging in terms of volume (50%) and weight(30%) and offer flexibility and growth capability 2. reduce costs (20%)using market standard components 3. enhance reliability (50%)through thermal and vibration improvement 4. mitigate EMC protection penalties in composite fuselage environment 5. ensure fast production ramp up and support rapid final assembly on Aircraft 6. improve availability and reduce maintenance cost 7. using of composite materials for packaging
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JU - Aeronautics, aerodynamics, aeroplanes
CEP - secondary branch
JA - Electronics and optoelectronics
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20201 - Electrical and electronic engineering<br>20304 - Aerospace engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jan 1, 2011
Realization period - end
Apr 30, 2014
Project status
U - Finished project
Latest support payment
Mar 20, 2014
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP15-MSM-7E-U/01:1
Data delivery date
Jul 2, 2015
Finance
Total approved costs
1,829 thou. CZK
Public financial support
1,829 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK