All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7E11016

Osteoporotic Virtual Physiological Human

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP7-ICT-2007-2

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    13595/2011 ? 321

Alternative language

  • Project name in Czech

    Osteoporotic Virtual Physiological Human

  • Annotation in Czech

    Nearly four million osteoporotic bone fractures cost the European health system more than 30 billion Euro per year. This figure could double by 2050. After the first fracture, the chances of having another one increase by 86%. We need to prevent osteoporotic fractures. The first step is an accurate prediction of the patient-specific risk of fracture that considers not only the skeletal determinants but also the neuromuscular condition. The aim of VPHOP is to develop a multiscale modelling technology based on conventional diagnostic imaging methods that makes it possible, in a clinical setting, to predict for each patient the strength of his/her bones, how this strength is likely to change over time, and the probability that the he/she will overload his/her bones during daily life. With these three predictions, the evaluation of the absolute risk of bone fracture will be much more accurate than any prediction based on external and indirect determinants, as it is current clinical practice. These predictions will be used to: i) improve the diagnostic accuracy of the current clinical standards; ii) to provide the basis for an evidence-based prognosis with respect to the natural evolution of the disease, to pharmacological treatments, and/or to preventiveinterventional treatments aimed to selectively strengthen particularly weak regions of the skeleton. For patients at high risk of fracture, and for which the pharmacological treatment appears insufficient, the VPHOP system will also assist the interventional radiologist in planning the augmentation procedure. The various modelling technologies developed during the project will be validated not only in vitro, on animal models, or against retrospective clinical outcomes, but will also be assessed in termof clinical impact and safety on small cohorts of patients enrolled at four different clinical institutions, providing the factual basis for effective clinical and industrial exploitations.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JC - Computer hardware and software

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20206 - Computer hardware and architecture

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Oct 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Apr 4, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-7E-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    555 thou. CZK

  • Public financial support

    555 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK