All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7G13002

Full Scale Demonstration of Plugs and Seals

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP7-SST-2012-RTD-1

  • Main participants

    České vysoké učení technické v Praze / Fakulta stavební

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-42111/2013-310

Alternative language

  • Project name in Czech

    Full Scale Demonstration of Plugs and Seals

  • Annotation in Czech

    DOPAS aims to improve the adequacy and consistency regarding industrial feasibility of plugs and seals, the measurement of their characteristics, the control of their behavior over time in repository conditions and also their hydraulic performance acceptable with respect to the safety objectives. This DOPAS project addresses the design basis, reference designs and strategies to demonstrate the compliance of the reference designs to the design basis, for plugs and seals in geological disposal facilities.The project focuses on shaft seals for salt rock (German repository concept), tunnel plugs for clay rock (French and Swiss repository concepts), and tunnel plugs for crystalline rock (Czech, Finnish and Swedish repository concepts). Five different demonstration experiments are part of the project and will take place in Sweden, France, Finland, Czech Republic and Germany. They are in different state-of-development. The Swedish demonstrator will be constructed prior to start of the DOPAS project and willbasically provide experience on demonstration of compliance of reference design to the design basis. German demonstrator will be installed after the DOPAS project and will focus on demonstration of suitability by performance assessment. The French, Finnish, Swedish,German and the Czech experiments will address developments in all phases of design basis, reference designs and strategies to demonstrate compliance of reference designs to design basis. The studied concepts will be developed in the DOPAS'sfive thematic scientific/technological work packages, which each integrate the results of the individual experiments. The DOPAS project is derived from the IGD-TP's Strategic Research Agenda that points out the topic of ?plug and seals? as a first priority issue for joint European RTD projects.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    JF - Nuclear energy

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20305 - Nuclear related engineering; (nuclear physics to be 1.3);

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jan 1, 2013

  • Realization period - end

    Aug 31, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Feb 26, 2016

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP17-MSM-7G-U/01:1

  • Data delivery date

    Jun 20, 2017

Finance

  • Total approved costs

    16,090 thou. CZK

  • Public financial support

    16,090 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK