All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7G13004

Safety of ACtinide Separation proceSSes

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP7-SST-2012-RTD-1

  • Main participants

    České vysoké učení technické v Praze / Fakulta jaderná a fyzikálně inženýrská

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-42111/2013-310

Alternative language

  • Project name in Czech

    Safety of ACtinide Separation proceSSes

  • Annotation in Czech

    Nuclear power plays a key role in limiting EU?s greenhouse gases emissions, and makes an important contribution to improve European Union?s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensuring a robust and socially acceptable system of protection of man and environment. Among the different strategies, partitioning and transmutation (P&T) allows a reduction of the amount, the radiotoxicity and the thermal power of these wastes, leading to an optimal use of geological repository sites. In line with the Strategic Research Agenda of SNE-TP, the SACSESS collaborative project will provide a structured framework to enhance the fuel cycle safety associated to P&T. In addition, safety studies will be performed for each selected process to identify weak points to be studied further. These data will be integrated to optimise flowsheets and process operation conditions. A training and education programme will be implemented in close collaboration with other European initiatives, addressing safety issues of nuclear energy industry. The multidisciplinary consortium composed of European universities, nuclear research bodies, TSOs and industrial stakeholders will generate fundamental safety improvements on the future design of an Advanced Processing Unit. SACSESS will thus be an essential contribution to thedemonstration of the potential benefits of actinide partitioning to the global safety of the long-lived waste management.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    DL - Nuclear waste, radioactive pollution and control

  • CEP - secondary branch

    CH - Nuclear and quantum chemistry, photo chemistry

  • CEP - another secondary branch

    CB - Analytical chemistry, separation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10402 - Inorganic and nuclear chemistry<br>10406 - Analytical chemistry<br>10511 - Environmental sciences (social aspects to be 5.7)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jan 3, 2013

  • Realization period - end

    Feb 29, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Feb 26, 2016

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP17-MSM-7G-U/01:1

  • Data delivery date

    Jun 20, 2017

Finance

  • Total approved costs

    882 thou. CZK

  • Public financial support

    882 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK