All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7H11075

Contribution to Analysis of Rotor Hub Drag Reduction

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    22332/2011-321

Alternative language

  • Project name in Czech

    Contribution to Analysis of Rotor Hub Drag Reduction

  • Annotation in Czech

    The drag of rotor hub is a major contributor to the overall drag of helicopter. it is therfore important to throughly investigate possible techniques to reduce the drug of this unit. The overall aim of the project is to undertake a wind tunel test and produce a high quality experimantal data set to allow this to be done. Load cells will be utilised to measure forces generated by the overall model and also to measure the loads of specific components of the model. The loads data will be supplemented by flow field data which will be acquired using Particle Image Velocimetry (PIV) systems, both 3D and time-resolved (TR).

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JU - Aeronautics, aerodynamics, aeroplanes

  • CEP - secondary branch

    JT - Propulsion, engines and fuels

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20301 - Mechanical engineering<br>20304 - Aerospace engineering<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Results of the project are assessed at international level. MEYS does not realize evaluation of Czech participation in the project with regard to its multinational character.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Oct 30, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Feb 25, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MSM-7H-U/01:1

  • Data delivery date

    Jun 30, 2014

Finance

  • Total approved costs

    1,859 thou. CZK

  • Public financial support

    503 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,356 thou. CZK