All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
8A16005

European initiative to enable validation for highly automated safe and secure systems

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    H2020-ECSEL-2015-2-IA-two-stage - Innovation Actio

  • Main participants

    České vysoké učení technické v Praze / Fakulta elektrotechnická

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-22210/2016-1

Alternative language

  • Project name in Czech

    European initiative to enable validation for highly automated safe and secure systems

  • Annotation in Czech

    ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competitiveness in the global race of automated systems with an expected market potential of 60B€ in 2025. Project results will be used to propose standardized validation procedures for highly automated systems (ACPS). The technical objectives addressed are: 1. Provision of a test and validation framework that proves the functionality, safety and security of ACPS with at least 50% less test effort than required in classical testing. 2. Promotion of a new technique for testing of automated systems with physical sensor signal stimuli generators, which will be demonstrated for at least 3 physical stimuli generators. 3. Raising significantly the level of dependability of automated systems due to provision of a holistic test and validation platform and systematic coverage measures, which will reduce the probability of malfunction behavior of automated systems to 10E-9/h. 4. Provision of a validation environment for rapid re-qualification, which will allow reuse of validation scenarios in at least 3 development stages. 5. Establish open standards to speed up the adoption of the new validation tools and methods for ACPS. 6. Enabling safe, secure and functional ACPS across domains. 7. Creation of an eco-system for the validation and verification of automated systems in the European industry.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JD - Use of computers, robotics and its application

  • CEP - secondary branch

    IN - Informatics

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)<br>20204 - Robotics and automatic control<br>20205 - Automation and control systems

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The MEYS does not evaluate the results of the project solution on the basis of the decision to provide institutional support for the given project, as the condition for support is that the applicant has been selected by an international provider in accordance with the rules of the relevant program. The project is evaluated at the international level by an international provider. A new learnable method for active 3D sensing is the main scientific result of the project. Close cooperation between university and other Czech industrial partner, Valeo, intensified high-tech industry, and continues in a form of contractual research.

Solution timeline

  • Realization period - beginning

    May 1, 2016

  • Realization period - end

    May 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 20, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP20-MSM-8A-U/01:1

  • Data delivery date

    Jun 18, 2020

Finance

  • Total approved costs

    4,730 thou. CZK

  • Public financial support

    4,730 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    3,150 thou. CZK