Aggregated Quality Assurance for Systems
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
TrustPort, a.s.
Contest type
M2 - International cooperation
Contract ID
MSMT-20404/2017-1
Alternative language
Project name in Czech
Aggregated Quality Assurance for Systems
Annotation in Czech
The AQUAS project investigates the challenges arising from the inter-dependence of safety, security and performance of systems and aims at efficient solutions for the entire product lifecycle within three essential capabilities of the ECSEL JU MASRIA 2016: Design Technologies (DT), Cyber-Physical Systems (CPS), and European Asset Protection (EAP). The project builds on knowledge of partners gained in current or former EU projects and will demonstrate the newly conceived approaches across use cases spanning Space, Medicine, Transport and Industrial Control. Key outputs: - A global concept framework for safety/security/performance co-engineering: - Demonstrators derived from tools and best practices: - A public domain document at the end of the project describing: - Improved standards for dependability of complex systems: .
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
IN - Informatics
CEP - secondary branch
JC - Computer hardware and software
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)<br>20206 - Computer hardware and architecture
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
As a member of a consortium of 23 international institutions, TrustPort participated in the solution of the AQUAS project, aimed at saving costs and time required for the development of industrial products. The output of the project was the methodology and a developed tool to support this methodology.
Solution timeline
Realization period - beginning
May 1, 2017
Realization period - end
Apr 30, 2020
Project status
U - Finished project
Latest support payment
Feb 27, 2020
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP21-MSM-8A-U/01:1
Data delivery date
Jun 23, 2021
Finance
Total approved costs
10,992 thou. CZK
Public financial support
2,749 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
8,243 thou. CZK