From the cloud to the edge - smart IntegraTion and OPtimization Technologies for highly efficient Image and VIdeo processing Systems
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
REX Controls s.r.o.
Contest type
M2 - International cooperation
Contract ID
MSMT-22723/2018-17/10
Alternative language
Project name in Czech
From the cloud to the edge - smart IntegraTion and OPtimization Technologies for highly efficient Image and VIdeo processing Systems
Annotation in Czech
The objective of FitOptiVis is to develop a cross-domain approach for smart integration of image- and video-processing pipelines for CPS covering a reference architecture, supported by low-power, high-performance, smart devices, and by methods and tools for combined design-time and run-time multi-objective optimisation within system and environment constraints. Low latency Image processing is often crucial for autonomy, and performing the right interaction of the CPS with its environment. Many CPS demonstrators in the project have sensors and processing at distributed places. For many reasons (parts of) CPS have to operate on low energy, whereas the complete system needs results with low latency. The focus of the project is on multi-objective optimisation for performance and energy use. However, other qualities, like reliability, security etc. also play a role in the optimisation. FitOptiVis will provide a reference architecture supporting composability built on suitable component abstractions and embedded sensing, actuation and processing devices adhering to those abstractions. The reference architecture will support design portability, on-line multi-objective quality and resource management and run-time adaptation guaranteeing system constraints and requirements based on platform virtualization.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20204 - Robotics and automatic control
OECD FORD - secondary branch
20205 - Automation and control systems
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JD - Use of computers, robotics and its application
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Within the FitOptiVis project was designed, implemented and validated robot calibration systém used to set-up robots and determine parameters of its variable components. For the construction WP5 components of collaborating parties were used.
Solution timeline
Realization period - beginning
Jun 1, 2018
Realization period - end
Nov 30, 2021
Project status
U - Finished project
Latest support payment
Feb 12, 2021
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP22-MSM-8A-U
Data delivery date
Jun 28, 2022
Finance
Total approved costs
2,365 thou. CZK
Public financial support
948 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
1,417 thou. CZK