All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
8B16007

Traceability routes for electrical power quality measurements

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    Český metrologický institut

  • Contest type

    M2 - International cooperation

  • Contract ID

    MSMT-21096/2016-7

Alternative language

  • Project name in Czech

    Traceability routes for electrical power quality measurements

  • Annotation in Czech

    The overall aim of this project is to develop and validate a modular metrology grade system for the measurement of power and PQ parameters using digital sampling techniques. The specific scientific and technical objectives of the project are: 1. To design a modular, metrology grade measurement setup for sampled electrical power and PQ parameters measurements, including a review of existing measurement and calibration methods, associated hardware and software, investigation of the optimum use of equipment already available within the NMIs/DIs and extension of traceability for power and PQ measurements up to 1 MHz. 2. To develop and validate a modular measurement setup for sampled electrical power and PQ parameters measurements, which can be easily established at NMIs/DIs and at other organisations. The target uncertainties of the modular measurement setup are at least four times smaller than the tolerances specified in documentary standards for PQ meters, e.g. the target expanded uncertainties for the amplitude of voltage harmonics of the modular measurement setup are 1.25 % of the measured EMPIR Page 7 of 46 15RPT04 TracePQM Annex 1 v1.0 voltage harmonic for measured values higher or equal to 1 % of the nominal voltage and 0.012 % of the nominal voltage for measured values lower than 1 % of the nominal voltage. 3. To develop an open software tool for instrumentation control, data acquisition and the calculation of electrical power and PQ parameters with full uncertainty estimation. 4. To develop and make available a good practice guide for the assembly and operation of the modular measurement setup including the calibration of all components so as to establish full traceability to the SI of the electrical power and PQ parameters measured. The guide will include the manual for the open software tool to assist users in the extension and modification of the modular measurement setup.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jun 1, 2016

  • Realization period - end

    May 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 12, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP20-MSM-8B-U/01:1

  • Data delivery date

    Jun 18, 2020

Finance

  • Total approved costs

    3,372 thou. CZK

  • Public financial support

    1,768 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,604 thou. CZK