All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
8B16011

Optical frequency transfer – a European network

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    Český metrologický institut

  • Contest type

    M2 - International cooperation

  • Contract ID

    MSMT-21096/2016-7

Alternative language

  • Project name in Czech

    Optical frequency transfer – a European network

  • Annotation in Czech

    The project has the following objectives: 1. To connect two or more clocks belonging to NMIs in Europe with optical fibre links and enable multiple OC comparisons at a fractional instability level from 10-17 to 10-18 . 2. To assess and improve the accuracy and stability of remote optical frequency transfer by optical fibres, aiming for a fractional instability and uncertainty <10-19 (over one day). 3. To develop techniques that improve the reliability and scalability of frequency transfer over optical fibre, striving for continuous measurements (more than one day duration) and simultaneous operation of branched long-distance links. 4. To operate long-distance optical fibre links (measurement uncertainty <10-17 at one day) and to perform fast and accurate frequency comparisons (0.5-1 day duration, combined statistical Cs fountain clock uncertainty 2-3×10-16) between Europe's Cs fountain clocks. 5. To develop applications of fibre-based frequency comparison and dissemination techniques for very long-baseline (VLBI >300 km) geodesy experiments and for ground-space-ground frequency comparisons, especially to assess the performance of the MicroWave Link (MWL) and/or the EMPIR Page 8 of 56 15SIB05 OFTEN Annex 1 v1.0 European Laser Timing Link (ELT) technology in the Atomic Clock Ensemble in Space (ACES), by simultaneously comparing clocks over both fibre and space links. 6. To facilitate the take up of the technology and measurement infrastructure developed within the project by the measurement supply chain (accredited laboratories, instrumentation manufacturers) and end users (space, geodesy, telecommunications, etc.).

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JA - Electronics and optoelectronics

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jun 1, 2016

  • Realization period - end

    May 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 12, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP20-MSM-8B-U/01:1

  • Data delivery date

    Jun 18, 2020

Finance

  • Total approved costs

    597 thou. CZK

  • Public financial support

    315 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    282 thou. CZK