A versatile electrical impedance calibration laboratory based on digital impedance bridges
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Český metrologický institut
Contest type
M2 - International cooperation
Contract ID
MSMT-26680/2018-4/14
Alternative language
Project name in Czech
A versatile electrical impedance calibration laboratory based on digital impedance bridges
Annotation in Czech
1. To review the developments in digital impedance bridges in previous research projects, including e.g. EMRP JRP SIB53 AIM QuTE, and to determine the most suitable approach(es) to be adopted in this project based on industrial and stakeholder needs. 2. To realise and validate inductance scales in the range 1 mH - 10 H, with uncertainties in the 10-5 range, and a capacitance scale in the range 1 nF - 10 μF, at frequencies in the range 120 Hz - 1592 Hz, with uncertainties in the 10-6 range, suitable for primary dissemination towards industry and calibration centres. 3. To develop a good practice guide for the application of digital impedance bridges and the realisation of inductance and capacitance scales and a software tool for modelling uncertainties. 4. To develop new and/or improved draft Calibration and Measurement Capabilities (CMCs) in the context of the CIPM Mutual Recognition Arrangement (MRA) for the new inductance and capacitance capabilities. 5. For each partner, to develop an individual strategy for the long-term operation of the capacity developed, including regulatory support, research collaborations, quality schemes, and accreditation.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20201 - Electrical and electronic engineering
OECD FORD - secondary branch
—
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the MEYS does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jun 1, 2018
Realization period - end
May 31, 2021
Project status
U - Finished project
Latest support payment
Feb 8, 2021
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP22-MSM-8B-U
Data delivery date
Jun 27, 2022
Finance
Total approved costs
2,149 thou. CZK
Public financial support
1,128 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
1,021 thou. CZK