Developing of infrastructure for improved and harmonised metrological check of blood-pressure measurements in Europe
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Český metrologický institut
Contest type
M2 - International cooperation
Contract ID
8B19013
Alternative language
Project name in Czech
Developing of infrastructure for improved and harmonised metrological check of blood-pressure measurements in Europe
Annotation in Czech
The overall aim of the project is to develop sustainable metrological research capabilities to provide traceability for blood pressure measurement in Europe. This will include the development of a new advanced blood pressure oscillometric signal generator and investigation of its possible role as an absolute blood pressure standard to carry out checks of the performance of (SMs). The specific objectives are 1. To develop an advanced oscillometric signal generator device with the capability of accurately reproducing pre-recorded real-life oscillometric blood pressure pulses. 2. To define the necessary requirements and test procedures for the newly developed advanced oscillometric signal generator to become a reference standard to establish traceability for automated sphygmomanometers. 3. To develop a procedure for the periodic recalibration of the newly developed advanced oscillometric signal generator at the NMI level, including defining acceptable uncertainty limits of ±1.5 mmHg or better.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
30502 - Other medical science
OECD FORD - secondary branch
30502 - Other medical science
OECD FORD - another secondary branch
30502 - Other medical science
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
FP - Other medical fields
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jun 1, 2019
Realization period - end
May 31, 2022
Project status
U - Finished project
Latest support payment
Feb 21, 2022
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP23-MSM-8B-U
Data delivery date
Jun 30, 2023
Finance
Total approved costs
2,829 thou. CZK
Public financial support
2,829 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK