Traceable measurement capabilities for monitoring thermocouple perfomance
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Český metrologický institut
Contest type
M2 - International cooperation
Contract ID
8B19014
Alternative language
Project name in Czech
Traceable measurement capabilities for monitoring thermocouple perfomance
Annotation in Czech
The overall objective of the project is to develop novel methods and techniques that will significantly improve knowledge and facilities that will provide confidence in the verification of thermocouple performance and improving temperature measurement and control capability. The project will contribute to establishing low measurement uncertainty and reproducible process control in Europe. The specific objectives are: 1. To develop and test novel methods and devices for the monitoring of thermocouple drift in-situ in the temperature range up to 1100 °C. These methods have to be suitable for implementation in critical industrial processes in order to assist the users in maintenance and replacement decisions. 2. To develop and test easy-to-operate methods and instruments for the assessment of inhomogeneities of thermocouples for secondary calibration laboratories in the temperature range from 230 °C to 1100 °C. 3. To design and construct novel measurement facilities that can provide confidence in the verification of thermocouple performance and to identify and quantify the range of drift of the thermocouples. The new facilities, targeting primary calibration laboratories, should have the ability to measure the physical changes and behaviour of thermocouples under typical conditions of production and distribution processes with a target uncertainty of less than 1.5 °C.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
10700 - Other natural sciences
OECD FORD - secondary branch
10700 - Other natural sciences
OECD FORD - another secondary branch
10700 - Other natural sciences
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
—
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Hodnocení výsledků řešení ministerstvo neprovádí, neboť podmínkou podpory je, že uchazeč byl vybrán mezinárodním poskytovatelem v souladu s pravidly příslušného programu. Projekt je hodnocen až po jeho schválení mezinárodním poskytovatelem.
Solution timeline
Realization period - beginning
Jun 1, 2019
Realization period - end
May 31, 2022
Project status
U - Finished project
Latest support payment
Feb 21, 2022
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP23-MSM-8B-U
Data delivery date
Jun 30, 2023
Finance
Total approved costs
1,486 thou. CZK
Public financial support
1,486 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK