All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Is the occurrence of slope movements in the Cordillera Blanca, Peru, influenced by the El Niño Southern Oscillation?

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    Promoting the mobility of researchers and workers in the framework of international cooperation in R&D

  • Call for proposals

  • Main participants

    Ústav výzkumu globální změny AV ČR, v. v. i.

  • Contest type

    M2 - International cooperation

  • Contract ID

    MSMT-794/2018-17

Alternative language

  • Project name in Czech

    Je výskyt svahových pohybů v pohoří Cordillera Blanca (Peru) ovlivněn klimatickou oscilací El Niňo??

  • Annotation in Czech

    Hlavním cílem navrhovaného projektu je detekovat, interpretovat a statisticky vyhodnotit vztah (časoprostorový vzor) mezi výskytem svahových pohybů v pohoří Cordillera Blanca a hydrometeorologickými podmínkami s důrazem kladeným na fázi oscilace El Niño (ENSO), a to s využitím satelitních snímků pokrývajících období posledních 25 až 30 let a staničních hydrometeorologických dat. Dílčí cíle jsou: (i) vyvinout semi-automatický přístup pro objektově zaměřenou analýzu (object-based image analysis; OBIA) časových sérií satelitních snímků využitelných ve studované oblasti pohoří Cordillera Blanca za účelem mapování svahových pohybů; (ii) analyzovat časoprostorovou distribuci detekovaných svahových pohybů ve vztahu k vybraných fyzickogeografickým charakteristikám (např. geologické poměry, geomorfologické indexy, vegetační kryt) a jejich ‚hotspots‘; (iii) analyzovat vazby mezi fází ENSO popsanou indexem SOI (Southern Oscillation Index) a měřenými staničními daty SENAMHI s ohledem na probíhající globální a klimatické změny; (iv) analyzovat časoprostorovou distribuci a prostorové vzory škod způsobených svahovými pohyby s využitím dat databáze přírodních katastrof DesInventar; (v) formulovat základní implikace pro identifikaci (mapování) a hodnocení ohrožení na regionální úrovni s využitím odhalených časoprostorových vzorů výskytu svahových pohybů a jejich ‚hotspots‘.

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    10508 - Physical geography

  • OECD FORD - secondary branch

    10510 - Climatic research

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    DE - Earth magnetism, geodesy, geography<br>DG - Atmospheric sciences, meteorology

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    This project was being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked. All the planned meetings were realized and all the objectives were met. The results are in three levels: (i) scientific findings and outcomes (we have published our research findings in internationally reputable journal (Science of the Total Environment); second manuscript is under preparation for Landslides; we have presented our results at the international conference); (ii) development of the inter-institutional cooperation (we have prepared and submitted several project proposal where both institutes took part (SOLSTICE call, NGGP, UCPM); (iii) individual professional growth of researchers (career development and „soft skills“ development“).

Solution timeline

  • Realization period - beginning

    Jan 1, 2018

  • Realization period - end

    Dec 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 25, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP20-MSM-8J-U/01:1

  • Data delivery date

    Jun 24, 2020

Finance

  • Total approved costs

    134 thou. CZK

  • Public financial support

    134 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK