All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Abstract interpretation and verification of boolean regulatory networks

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    Promoting the mobility of researchers and workers in the framework of international cooperation in R&D

  • Call for proposals

  • Main participants

    Masarykova univerzita / Fakulta informatiky

  • Contest type

    M2 - International cooperation

  • Contract ID

    8J18FR045

Alternative language

  • Project name in Czech

    Abstraktní interpretace a verifikace parametrizovaných booleovských regulačních sítí

  • Annotation in Czech

    Analýza dynamických systémů prostřednictvím vhodných informatických modelů je jedním ze zásadních stavebních kamenů moderního paradigmatu systémové biologie. Motivace pro použití vhodných formalismů a výpočetních technik z oblasti počítačové vědy vychází z podstaty fungování biologického systému jako souboru komplexních souběžných procesů. Jedním z široce použávaných modelů jsou tzv. boolovské regulační sítě. Cílem projektu je rozšíření existujících formálních technik pro analýzu boolovských sítí s ohledem na jejich parametrizovanost bez nutnosti generování úplného stavového prostoru. Projekt je řešen ve spolupráci dvou špičkových skupin v oblasti formálních metod -- LRI Paris-Sud (statická analýza a Petriho sítě) a Laboratoř systémové biologie (Sybila FI MU, model checking a paralelní algoritmy).

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    AF - Documentation, librarianship, work with information<br>BC - Theory and management systems<br>BD - Information theory<br>IN - Informatics

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    This project was being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.

Solution timeline

  • Realization period - beginning

    Jan 1, 2018

  • Realization period - end

    Dec 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 19, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP20-MSM-8J-U/02:1

  • Data delivery date

    Jun 29, 2020

Finance

  • Total approved costs

    108 thou. CZK

  • Public financial support

    98 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK