All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Effect of the SPD process on the structure and mechanical properties of Al-Si based composites

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    Promoting the mobility of researchers and workers in the framework of international cooperation in R&D

  • Call for proposals

  • Main participants

    Vysoká škola báňská - Technická univerzita Ostrava / Fakulta materiálově- technologická

  • Contest type

    M2 - International cooperation

  • Contract ID

    MSMT-21494/2018-4

Alternative language

  • Project name in Czech

    Vliv procesů SPD na strukturu a mechanické vlastnosti kompozitu na bázi Al-Si a slitin Ti.

  • Annotation in Czech

    Hlavním cílem projektu je rozšíření vědecké spolupráce mezi VŠB - TU Ostrava a PAV Krakow v oblasti metod zjemňování struktury procesem SPD (vícenásobná plastická deformace).

Scientific branches

  • R&D category

    ZV - Basic research

  • OECD FORD - main branch

    20501 - Materials engineering

  • OECD FORD - secondary branch

    20506 - Coating and films

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JG - Metallurgy, metal materials<br>JK - Corrosion and material surfaces<br>JP - Industrial processes and processing

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    This project was being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.

Solution timeline

  • Realization period - beginning

    Jan 1, 2019

  • Realization period - end

    Dec 31, 2021

  • Project status

    U - Finished project

  • Latest support payment

    Apr 29, 2020

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP22-MSM-8J-U

  • Data delivery date

    Jun 30, 2022

Finance

  • Total approved costs

    196 thou. CZK

  • Public financial support

    170 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK