Reliable Powerdown for Industrial Drives
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Vysoké učení technické v Brně / Středoevropský technologický institut
Contest type
M2 - International cooperation
Contract ID
MSMT-20956/2023-3/15
Alternative language
Project name in Czech
Reliable Powerdown for Industrial Drives
Annotation in Czech
R-PODID aims to develop an automated, cloudless, short-term fault-prediction for electric drives, power modules and power devices that can be integrated into power converters. Thereby, electrical and mechanical faults of machines and of the power converters driving them will become predictable within a limited prediction horizon of 12-24 hours. This will enable a power-saving shutdown of a larger number of production machines during idle times, because a looming failure during the next power-on cycle can be reliably foreseen. It will also enable reliable mitigation of dangerous faults in applications using modern power-devices like silicon-carbide (SiC) and III/V-semiconductor devices like gallium-nitride (GaN).
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20201 - Electrical and electronic engineering
OECD FORD - secondary branch
20204 - Robotics and automatic control
OECD FORD - another secondary branch
20205 - Automation and control systems
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation<br>JD - Use of computers, robotics and its application
Solution timeline
Realization period - beginning
Sep 1, 2023
Realization period - end
Aug 31, 2026
Project status
B - Running multi-year project
Latest support payment
Feb 17, 2024
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP24-MSM-9A-R
Data delivery date
Feb 19, 2024
Finance
Total approved costs
29,211 thou. CZK
Public financial support
18,986 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
10,224 thou. CZK