All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
9B22001

Operando metrology for energy storage materials

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    Český metrologický institut

  • Contest type

    M2 - International cooperation

  • Contract ID

    9B22001

Alternative language

  • Project name in Czech

    Operando metrology for energy storage materials

  • Annotation in Czech

    The aim of the joint research programme is to develop operational techniques and hybrid (multimodal) instrumentation, supported by quantitative and validated ex situ analysis and electrochemical measurements, to go beyond state-of-the-art materials characterisation for high-capacity energy storage technologies. The specific objectives of the project are to develop traceable methods of chemical, physical and structural analysis for ex situ characterisation of high capacity energy storage materials, with a focus on X-ray spectroscopic techniques, including the production and qualification of calibration samples and validation through inter-laboratory studies, and to develop best practice guides for current and emerging operational spectroscopy methods, including X-ray and vibrational spectroscopy, validated by ex situ analysis and ring activities, to improve the repeatability and accuracy of experiments.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20501 - Materials engineering

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JG - Metallurgy, metal materials<br>JP - Industrial processes and processing

Solution timeline

  • Realization period - beginning

    Sep 1, 2022

  • Realization period - end

    Aug 31, 2025

  • Project status

    B - Running multi-year project

  • Latest support payment

    Jan 25, 2024

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP24-MSM-9B-R

  • Data delivery date

    Feb 19, 2024

Finance

  • Total approved costs

    3,451 thou. CZK

  • Public financial support

    1,725 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK