All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The draft of measures for labor protection advancement during tunnels and drifts entry driwing with use new Austria tunnelling technique.

Public support

  • Provider

    Czech Mining Office Board

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    VZ - Public procurement

  • Contract ID

    SBS 33643/2010

Alternative language

  • Project name in Czech

    Návrh opatření ke zvýšení úrovně zajištění bezpečnosti při realizaci podzemních staveb novou rakouskou tunelovací metodou

  • Annotation in Czech

    Provést analýzu právních předpisů upravujících ražbu tunelů a štol, Navrhnout jednotný vzor (osnovu) Technologického postupu k provádění ražeb tunelů a štol, Navrhnout novelu vyhlášky č. 55/1996 Sb. za účelem zvýšení úrovně zajištění bezpečnosti při provádění ražeb tunelů a štol.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project met the award of the contract in its entirety, including a proposal: - Technological progress in the uniform format for excavation of tunnels and shafts, - revised regulations nr. 55/1996 in order to improve work safety in the excavation of tunnels and shafts.

Solution timeline

  • Realization period - beginning

    Oct 1, 2010

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Dec 10, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-CBU-AB-U/01:1

  • Data delivery date

    Jun 3, 2011

Finance

  • Total approved costs

    514 thou. CZK

  • Public financial support

    514 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK