All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The draft of measures for labor protection advancement during tunnels and drifts entry driwing with use new Austria tunnelling technique.

Project goals

Realisation of analisis legal governing rules arrange entry driving and drifts. Propound the unific standart for Technological consecution for entry driwing of tunnels and drifts. Propound the novel of promulgation No 55/1966 Sb. with the wiew of advancement labor protection during entry driwing of tunnels and drifts.

Keywords

New Austrian Tunnels Metodtunel driving

Public support

  • Provider

    Czech Mining Office Board

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    VZ - Public procurement

  • Contract ID

    SBS 33643/2010

Alternative language

  • Project name in Czech

    Návrh opatření ke zvýšení úrovně zajištění bezpečnosti při realizaci podzemních staveb novou rakouskou tunelovací metodou

  • Annotation in Czech

    Provést analýzu právních předpisů upravujících ražbu tunelů a štol, Navrhnout jednotný vzor (osnovu) Technologického postupu k provádění ražeb tunelů a štol, Navrhnout novelu vyhlášky č. 55/1996 Sb. za účelem zvýšení úrovně zajištění bezpečnosti při provádění ražeb tunelů a štol.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

  • CEP - another secondary branch

  • 20701 - Environmental and geological engineering, geotechnics
    20702 - Petroleum engineering (fuel, oils)
    20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project met the award of the contract in its entirety, including a proposal: - Technological progress in the uniform format for excavation of tunnels and shafts, - revised regulations nr. 55/1996 in order to improve work safety in the excavation of tunnels and shafts.

Solution timeline

  • Realization period - beginning

    Oct 1, 2010

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Dec 10, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-CBU-AB-U/01:1

  • Data delivery date

    Jun 3, 2011

Finance

  • Total approved costs

    514 thou. CZK

  • Public financial support

    514 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK

Basic information

Recognised costs

514 CZK thou.

Public support

514 CZK thou.

100%


Provider

Czech Mining Office Board

CEP

DH - Mining industry including coal mining and processing

Solution period

01. 10. 2010 - 31. 12. 2010