All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Road tunnel safety harmonization with the requirements of the Directive 2004/54/EC and road tunnel optimalization from safety aspects, abbr. SAFETUN

Public support

  • Provider

    Ministry of Transport

  • Programme

    Branch research

  • Call for proposals

    Podpora realizace udržitelného rozvoje dopravy 1 (SMD02007CG001)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    11/2007-520-TPV

Alternative language

  • Project name in Czech

    Harmonizace bezpečnosti tunelů pozemních komunikací s požadavky Direktivy 2004/54/ES a optimalizace tunelů z hlediska bezpečnosti

  • Annotation in Czech

    Cílem projektu je realizace Evropské direktivy 54/2004/ES v národním prostředí a to rozpracováním pro krátké tunely, vytvoření prostředí pro hodnocení rizik v tunelech a systematický tréning obsluh.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    JC - Computer hardware and software

  • CEP - another secondary branch

    JS - Reliability and quality management, industrial testing

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>20206 - Computer hardware and architecture<br>20306 - Audio engineering, reliability analysis

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The process of solution and the results comport with the contract. The aim was filled, required outputs were elaborated.

Solution timeline

  • Realization period - beginning

    Apr 1, 2007

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    May 28, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MD0-CG-U/01:2

  • Data delivery date

    Jul 1, 2010

Finance

  • Total approved costs

    4,040 thou. CZK

  • Public financial support

    3,422 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    618 thou. CZK