Increase the reliability and lifetime of the tunnel lining using information models and new approaches
Project goals
The proposed project is targeting to increase safety and failure tunnels, supporting sustainable transport in the Czech Republic. The objectives are new and current and are supported by the opinions of SŽDC, CzTA and ŘSD. a) Development of a methodology for procedures for monitoring the secondary lining of the tunnel throughout the life cycle of the tunnel needed to evaluate its behavior and assess the technical condition, leading to reduced failure rates and extended service life b) Preparation of a catalog of defects and failures of the tunnel lining containing the causes, including the possibility of remediation. c) Developtment of a database for BIM options, enabling a uniform and clear way to collect data for the interpretation of tunnel behavior.
Keywords
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
2.VS DOPRAVA 2020+ (STA02021CK020)
Main participants
České vysoké učení technické v Praze / Fakulta stavební
Contest type
VS - Public tender
Contract ID
CK02000175 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Zvýšení spolehlivosti a životnosti ostění tunelů využitím informačních modelů a nových přístupů
Annotation in Czech
Navrhovaný projekt cílí na zvýšení bezpečnosti provozu a snížení rizika vad tunelů, čímž podporuje udržitelnost dopravy v ČR. Navrhované cíle jsou nové a aktuální a jsou podpořené stanovisky SŽ, CzTA a ŘSD. a) Vypracování metodiky postupu sledování tunelového ostění po celé období jeho životního cyklu, získávání a jednotné ukládání dat potřebných pro vyhodnocování jeho chování a technického stavu s cílem zjištění příčin vad a snížení poruchovosti. b) Vytvoření katalogu vad ostění obsahujícího možné příčiny jejich vzniku a návrh sanace. c) Vytvoření databázové struktury, umožňující jednotným a přehledným způsobem shromažďovat data pro vyhodnocení chování ostění, zjišťování jeho aktuálního stavu, návrh sanací a sledování jejich historie po dobu životního cyklu s možností využití v BIM
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20101 - Civil engineering
OECD FORD - secondary branch
20102 - Construction engineering, Municipal and structural engineering
OECD FORD - another secondary branch
20104 - Transport engineering
GB - Agricultural machines and construction
JM - Structural engineering
JN - Civil engineering
JO - Land transport systems and equipment
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
These are preliminary data, the Final Oponnent Panel hasn´t proceeded yet.
Solution timeline
Realization period - beginning
Jan 1, 2021
Realization period - end
Dec 31, 2023
Project status
U - Finished project
Latest support payment
Feb 28, 2023
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP24-TA0-CK-U
Data delivery date
Jun 28, 2024
Finance
Total approved costs
6,962 thou. CZK
Public financial support
5,569 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
1,392 thou. CZK
Recognised costs
6 962 CZK thou.
Public support
5 569 CZK thou.
0%
Provider
Technology Agency of the Czech Republic
OECD FORD
Civil engineering
Solution period
01. 01. 2021 - 31. 12. 2023