All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Partial improvement of navigation conditions on the regulated Elbe between Ústí nad Labem and the state border of the Czech Republic / Germany

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    —

  • Call for proposals

    2.VS DOPRAVA 2020+ (STA02021CK020)

  • Main participants

    České vysoké učení technické v Praze / Fakulta stavební

  • Contest type

    VS - Public tender

  • Contract ID

    CK02000214 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Částečné zlepšení plavebních podmínek na regulovaném Labi mezi Ústím nad Labem a státní hranicí ČR/SRN

  • Annotation in Czech

    Úsek pod vodním dílem Střekov v Ústí nad Labem po státní hranici se SRN je pro plavbu provozně nespolehlivý. Úprava vodní cesty je pouze pomocí regulačních staveb a parametry vodní cesty závisí pouze na aktuálním průtoku v korytě. Vlivem rozkolísání průtoků není stávající vodní cesta spolehlivá a vytváří provozní problémy a zvýšené náklady na její provoz a využití. Cílem je navrhnout a posoudit taková technická a organizační opatření, která by dočasně, do doby realizace definitivních investičních opatření, zajistila alespoň částečné zlepšení plavebních podmínek a přispěla ke zmírnění trendu omezení vodní dopravy v regulovaném úseku Labe. Navržená opatření by neměla být v rozporu s podmínkami ochrany životního prostředí a investiční a provozní náklady by měly být co nejmenší.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20104 - Transport engineering

  • OECD FORD - secondary branch

    20102 - Construction engineering, Municipal and structural engineering

  • OECD FORD - another secondary branch

    10501 - Hydrology

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    DA - Hydrology and limnology<br>GB - Agricultural machines and construction<br>JM - Structural engineering<br>JO - Land transport systems and equipment

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The project achieved excellent results. It is a meaningful undertaking characterized by a high level of technical expertise and significant societal relevance. The proposed methods were applied appropriately and in alignment with the Recipient's original objectives. The project utilized RCP2.6 and RCP8.5 climate scenarios in conjunction with the HadGEM2-ES climate model—currently employed across various sectors as a likely benchmark for climate change. Based on these inputs, flow rates for the lower Elbe River within the Czech Republic were assessed, and flow velocities and navigable depths were analyzed. Furthermore, a mathematical model was developed to enable the rapid assessment of a wide range of potential navigation scenarios. Using the data obtained, safety margins were proposed and critical sections were identified along the monitored stretch of the river. Technical measures were proposed and evaluated to ensure the safety and efficiency of commercial river navigation.

Solution timeline

  • Realization period - beginning

    Jan 1, 2021

  • Realization period - end

    Dec 31, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2022

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP23-TA0-CK-U

  • Data delivery date

    Sep 23, 2026

Finance

  • Total approved costs

    2,662 thou. CZK

  • Public financial support

    2,124 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    539 thou. CZK