The enhancement of the fatigue strength of the high strength steel welded details for new and temporary bridges and their renovation
Project goals
The main aim of the project is focused on the welded structural details made from high strength steel, loaded by the dynamic loading. The potential of the high frequency impact treatment method (HFMI) of welded detail will be analysed. This method is generally recommended by IIW, but the method is not covered neither by standards, nor by experiments. The application of HFMI will be verified on the fatigue exposed structure in the loading types with limited amount of experiments. The project results will be directly useful for the solving of the critical infrastructure safety problems in the Czech Republic. The main goal is to get new theoretical and practical experiences with the application of the HFMI method to enhance fatigue strength of welded details of high strength steels.
Keywords
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
3.VS DOPRAVA 2020+ (STA02022CK030)
Main participants
České vysoké učení technické v Praze / Fakulta stavební
Contest type
VS - Public tender
Contract ID
CK03000162 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Zvyšování únavové odolnosti exponovaných svařovaných detailů z vysokopevnostních ocelí pro nové mosty, opravy a mostní provizoria
Annotation in Czech
Cílem projektu je zvýšení životnosti detailů svařených z vysokopevnostní oceli a vystavené časově proměnlivému zatížení. Zkoumán bude potenciál metody vysokofrekvenčního opracování svarových spojů (HFMI = High-Frequency Mechanical Impact). Tuto metodu pro zvýšení únavové pevnosti svarů doporučuje International Institute of Welding, přesto ale není normalizována ani plně pokryta experimenty. Ověřeny budou aplikace HFMI na únavově exponované konstrukce v režimech zatěžování, kde zatím není dostatek experimentů. Výstupy z projektu budou využitelné při budoucím řešení nastíněných problémů zajištění bezpečnosti ČR. Cílem je získat nové teoretické poznatky, praktické zkušenosti i zručnost při aplikaci metody HFMI pro zvyšování únavové pevnosti svarových spojů z vysokopevnostních ocelí.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20102 - Construction engineering, Municipal and structural engineering
OECD FORD - secondary branch
20501 - Materials engineering
OECD FORD - another secondary branch
20101 - Civil engineering
GB - Agricultural machines and construction
JG - Metallurgy, metal materials
JM - Structural engineering
JN - Civil engineering
JP - Industrial processes and processing
Solution timeline
Realization period - beginning
Mar 1, 2022
Realization period - end
Feb 28, 2025
Project status
K - Ending multi-year project
Latest support payment
Feb 28, 2024
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP25-TA0-CK-R
Data delivery date
Feb 20, 2025
Finance
Total approved costs
12,330 thou. CZK
Public financial support
9,864 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
2,466 thou. CZK
Basic information
Recognised costs
12 330 CZK thou.
Public support
9 864 CZK thou.
80%
Provider
Technology Agency of the Czech Republic
OECD FORD
Construction engineering, Municipal and structural engineering
Solution period
01. 03. 2022 - 28. 02. 2025