Technologies and procedures for the protection of historic concrete bridges
Public support
Provider
Ministry of Culture
Programme
Programme for the Support of Applied Research and Exp. Development of National and Cultural Identity dor the Years 2016-2022 (in short, "NAKI II")
Call for proposals
SMK02020DG003
Main participants
České vysoké učení technické v Praze / Kloknerův ústav
Contest type
VS - Public tender
Contract ID
005/2020/OVV
Alternative language
Project name in Czech
Technologie a postupy pro ochranu historických betonových mostů
Annotation in Czech
Technologický postup aplikace vysokopevnostních cementových kompozitů pro zesílení nosných i nenosných částí betonových a železobetonových mostů.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20102 - Construction engineering, Municipal and structural engineering
OECD FORD - secondary branch
20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)
OECD FORD - another secondary branch
20103 - Architecture engineering
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
AL - Art, architecture, cultural heritage<br>GB - Agricultural machines and construction<br>JI - Composite materials<br>JM - Structural engineering
Completed project evaluation
Provider evaluation
O - Nesplněno zadání, smlouva však byla dodržena
Project results evaluation
The project aimed to develop methods for reconstructing historical concrete bridges in line with monument care requirements. However, the project only partially met its goals, with only one applicable monument care procedure developed. Additionally, the majority of the project's scientific articles were unrelated to historical structures, and project funds were used for unrelated constructions. The project administration was challenging, and several expected results were not achieved, which were not explained in the final report. Only the repair principles of the Libeň Bridge in Prague were documented.
Solution timeline
Realization period - beginning
Mar 1, 2020
Realization period - end
Dec 31, 2022
Project status
U - Finished project
Latest support payment
Feb 1, 2022
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP23-MK0-DG-U
Data delivery date
Jun 6, 2023
Finance
Total approved costs
11,142 thou. CZK
Public financial support
11,142 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK