All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Creating infrastructure for the innovated study programme Physical and Material Engineering

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    České vysoké učení technické v Praze / Fakulta stavební

  • Contest type

    OP - EU Operational Programme

  • Contract ID

    16_017/0002623 - 01

Alternative language

  • Project name in Czech

    Vytvoření infrastruktury pro inovovaný doktorský studijní program Fyzikální a materiálové inženýrství (CZ/ENG)

  • Annotation in Czech

    Cílem projektu je modernizovat a doplnit stávající experimentální vybavení na Stavební fakultě tak, aby si posluchači zejména doktorských studijních programů mohli prakticky osvojovat nejmodernější experimentální metody, které se používají při zkoušení vlastností stavebních hmot a vývoji nových materiálů. Infrastruktura bude využívána v 10 inovovaných a 9 nových předmětech a kurzu doctoral school programu FMI, ale i pro samostatnou vědeckou činnost doktorandů. V obecné rovině je tedy cílem poskytnout doktorským studentům možnost prakticky si osvojit nejmodernější experimentální metody v oboru fyzikálního a materiálového inženýrství.

Scientific branches

  • R&D category

    IF - RDI infrastructure

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The goals of the project have been achieved. 8 new infrastructures were acquired and during the project these infrastructures were installed, tested and put into normal operation for teaching and research. There were also carried out construction modifications of the laboratory for electron microscopy. In the laboratory there is installed a set of instruments and other accessories used for this experimental method. Some devices were further upgraded by purchasing additional equipment or add-on software and carrying out above-standard training (beyond the basic training on delivery, which is included in the price of the device). This enables a wider range of uses of the acquired devices and thus expands the possibilities of students' research activities. The acquired infrastructure is used for teaching in innovated and new subjects as well as for research activities.

Solution timeline

  • Realization period - beginning

    Sep 1, 2017

  • Realization period - end

    Feb 28, 2020

  • Project status

    U - Finished project

  • Latest support payment

    Jun 27, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP21-MSM-EF-U/01:1

  • Data delivery date

    Jun 25, 2021

Finance

  • Total approved costs

    22,132 thou. CZK

  • Public financial support

    22,132 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,084 thou. CZK