All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

RECETOX RI UPgrade

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    Masarykova univerzita / Přírodovědecká fakulta

  • Contest type

    OP - EU Operational Programme

  • Contract ID

    CZ.02.1.01/0.0/0.0/18_046/0015975-1

Alternative language

  • Project name in Czech

    RECETOX RI UPgrade

  • Annotation in Czech

    Cílem tohoto projektu je dobudování, modernizace a navýšení laboratorních kapacit velké VI RECETOX tak, aby upevnila svou pozici v oblasti environmentálního výzkumu a rozšířila svoji podporu i do oblasti lidské expozice a veřejného zdraví. Zatímco v současné době realizovaný projekt OP VVV RECETOX RI z výzvy Výzkumné infrastruktury I se soustředí na vybudování infrastrukturního zázemí pro nově založenou centrální jednotku epidemiologických studií a financuje výstavbu nových prostor pro budoucí populační biobanku CELSPAC a technické vybavení vyšetřovacích prostor pro nabírané účastníky kohort, projekt OP VVV RECETOX RI UP zde předkládaný do výzvy Výzkumné infrastruktury II řeší zejména laboratorní kapacity. S jeho podporou dojde k rozšíření a modernizaci akreditovaných stopových laboratoří a zavedení nového systému pro management vzorků a dat, ale také k upgradu specializovaných laboratoří fotochemických, toxikologických a proteinového inženýrství. Projekt ale přispěje také k rozšíření skladovacích kapacit nové biobanky instalaci dalšího technologického modulu. To rozšíří spektrum nabízených služeb RI RECETOX směrem k multireziduálním analýzám toxických směsí, analýzám biomarkerů, novým toxikologickým modelům, materiálům a signálním molekulám aplikovatelným v biomedicínském výzkumu i bioinformatickým nástrojům široce využitelným pro analýzu a data mining biologických, chemických a medicínských dat. Díky novým manažerským systémům dojde ke zlepšení řízení a kvality poskytovaných služeb a zvýšení atraktivity VI RECETOX, což se projeví nárůstem počtu uživatelů VI.

Scientific branches

  • R&D category

    IF - RDI infrastructure

  • OECD FORD - main branch

    10401 - Organic chemistry

  • OECD FORD - secondary branch

    10511 - Environmental sciences (social aspects to be 5.7)

  • OECD FORD - another secondary branch

    10618 - Ecology

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    CC - Organic chemistry<br>DI - Pollution and air control<br>DJ - Pollution and water control<br>DK - Contamination and decontamination of soil including pesticides<br>DL - Nuclear waste, radioactive pollution and control<br>DM - Solid waste and its control, recycling<br>DO - Protection of landscape<br>EH - Ecology - communities

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    "The project dealt with the modernization and increase of the existing instrumented biobanking and laboratory capacity. The key infrastructure activity of this project targeted the development of completely new technologies needed to maintain the leading role of RECETOX RI in the ESFRI infrastructure EIRENE and establish cooperation with other ESFRI infrastructures (especially BBMRI and ELIXIR). With the support of this project there were modernized accredited trace laboratories. There was also introduced a new system for sample and data management, which improved the management and quality control of the services provided. This led to a further increase in the attractiveness of VI RECETOX, which was also reflected in the planned increase in the number of VI users. Specialized laboratories were also upgraded."

Solution timeline

  • Realization period - beginning

    Jan 1, 2020

  • Realization period - end

    Jan 31, 2023

  • Project status

    U - Finished project

  • Latest support payment

    Jun 6, 2022

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP24-MSM-EF-U

  • Data delivery date

    Jul 1, 2024

Finance

  • Total approved costs

    69,299 thou. CZK

  • Public financial support

    6,930 thou. CZK

  • Other public sources

    3,465 thou. CZK

  • Non public and foreign sources

    0 thou. CZK