Development of the first textile fire roller shutter in category EI
Public support
Provider
Ministry of Industry and Trade
Programme
—
Call for proposals
—
Main participants
AVAPS s.r.o.
Contest type
OP - EU Operational Programme
Contract ID
MPO 18754/17/61600/937
Alternative language
Project name in Czech
Vývoj prvního textilního roletového požárního uzávěru v kategorii EI
Annotation in Czech
Hlavním cílem projektu je výrazně posílit konkurenceschopnostspolečnosti AVAPS a to v celoevropském měřítku. Tohoto cíle bude dosaženo prostřednictvímvyvinutí vlastního textilníhoroletového požárního uzávěru v kategorii EI, jehož parametry budou minimálněsrovnatelné s produkty předních výrobců.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JJ - Other materials
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The possibility of using the result of the project, ie a textile roller shutter type EI without water cooling, is significant, whether on the domestic or foreign market. Roller shutters are generally widely used in a number of civil engineering buildings and manufacturing plants. In particular, permanently open openings of larger dimensions in fire walls (at the boundary of fire compartments) must be fitted with fire shutters which, in the event of a fire being detected, close and thus prevent the spread of fire for a certain period of fire resistance. Structurally and materially simpler roller shutters with lower fire resistance values (type EW, shorter time in minutes) usually require sprinkling with water, which brings more demanding design solutions, maintenance, repair, overhaul and last but not least risks associated with damage caused by run-off water.
Solution timeline
Realization period - beginning
Jul 10, 2015
Realization period - end
Aug 3, 2020
Project status
U - Finished project
Latest support payment
Oct 13, 2017
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP21-MPO-EG-U/01:1
Data delivery date
Jun 9, 2021
Finance
Total approved costs
10,634 thou. CZK
Public financial support
3,964 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
2,643 thou. CZK