All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development machine dehydratation of sludge at WWTP

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

  • Call for proposals

  • Main participants

    IN - EKO TEAM s.r.o.

  • Contest type

    OP - EU Operational Programme

  • Contract ID

    MPO 11362/17/61600/467

Alternative language

  • Project name in Czech

    ýzkum a vývoj strojní dehydratace kalů ČOV

  • Annotation in Czech

    Projekt je zaměřen na vývoj strojního zařízení na dehydrataci kalů ČOV s použitím principů, které je možno chránit užitným vzorem nebo patentem, splňující požadavky trhu s ohledem na maximální funkčnost a minimalizaci výrobních nákladů při respektování energetických a sociálních faktorů a uvést toto zařízení na trh. Uživateli jsou komunální ČOV a to malé s 3000 - 10000 obyvateli a střední velikosti do 20000 ekvivalentních obyvatel.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    DJ - Pollution and water control

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The aim of the project was to develop a plant for dehydration of sewage sludge using principles that can be protected by a utility model, meeting market requirements for maximum functionality and minimizing production costs while respecting energy and social factors and their parameters different from technologies available on the market. The developed equipment is designed for sludge dewatering, especially at smaller WWTPs (up to 20,000 PE). The aim was to enable the transport of sludge for further processing.

Solution timeline

  • Realization period - beginning

    Aug 4, 2015

  • Realization period - end

    Feb 10, 2020

  • Project status

    U - Finished project

  • Latest support payment

    Feb 9, 2017

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP21-MPO-EG-U/01:1

  • Data delivery date

    Jun 9, 2021

Finance

  • Total approved costs

    6,859 thou. CZK

  • Public financial support

    0 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    3,601 thou. CZK